Bahrain International Airport

Supervision of Manama International Airport expansion works in Bahrain

Update date:

Added value

ADP Ingénierie (ADPI) supervised the design of this expansion and therefore understands the project completely.

Context

The client needed to increase airport capacity and also improve passenger experience.

  • The client needed to increase passenger capacity as the existing terminal was saturated. The client initially considered expanding the terminal.
  • The client wanted to take advantage of this project to improve passenger experience by upgrading terminal services to IATA Standard B requirements.
  • The client requested that the terminal design be adjusted to new operational requirements during the construction phase.

Our solution

ADP Ingénierie (ADPI) recommended building a totally new 14 MPPA passenger terminal building rather than undertaking the refurbishment and expansion while in service of an existing saturated facility. The client approved our proposal. ADP Ingénierie is responsible for the studies and the design up to the shop drawings of the passenger terminal building, its ancillary facilities, viaduct, access roads, landside and airside infrastructure, including the technical and financial assistance during the tender phase of the various technical packages assigned to our company, and the supervision of all related works.

Key figures

prevision image

New passenger terminal : 14 MPPA

Ce projet est un succès
Off

Keep in touch

The subscriber's email address.
Join us on linkedin logo