ROLAND-GARROS REUNION AIRPORT

ROLAND-GARROS REUNION AIRPORT. STRENGTHENING AND ENLARGING PAVEMENTS

Start of construction:
Update date:

Added value

Study for reinforcement, resurfacing and widening of runways (14/32 and 12/30), taxiways (Alpha, Bravo, Charlie), Alpha taxilane and the establishment of a drainage and runoff network.
Complete renovation of the night marking of the two runways.
It is also about carrying out the business consultation file and monitoring the construction of the works.
All of this work is taking place with the maintenance of the airport in operation; this requires the implementation of a complex and concerted phasing with the operator, the civil aviation authorities and the different users of the platform.

Context

Air Austral, a airline based in La Reunion has announced the order of two A380s for 2014 and 2015.
This project responds to a dual problem of maintenance and adaptation of the two existing runways at the reception of the A380.

Our solution

The mission is to carry out pre-project studies, project studies, assistance for the awarding of works contracts, the approval of implementation studies, works project management and the assistance to reception operations.
ADP Ingénierie provided, in addition to the services described above, assistance to the project owner for the realization of EISA (Impact Assessment on Airport Safety).

Key figures

prevision image
RUNWAYS: 3,200 m x 45 m 2 670 mx 45 m
prevision image
CONSTRUCTION COST: 45 M € HT
Ce projet est un succès
On

Keep in touch

The subscriber's email address.
Join us on linkedin logo