Arturo Merino Benitez International Airport

Refurbishment of existing terminal, construction of new Terminal 2 and new aircraft stands of Arturo Merino Benitez International Airport

Start of construction:
Update date:

Added value

The client selected ADP Ingénierie for its expertise in BIM (certified training center) and its ability to challenge the existing draft proposal thanks to its expertise and airport experience.

travaux terminal international

Context

Santiago International Airport was experiencing an increase in traffic of more than 10% per year, which was rapidly overwhelming the existing infrastructure. Additionally, the airport no longer met the local standards in force, in particular those relating to earthquake-resistant requirements.

  • Provide a detailed design of the infrastructures to be refurbished, designed entirely in BIM.

  • Ability to review and analyze possible optimizations and variants of the existing project.

Our solution

Design services the refurbishment of the existing terminal, the new Terminal 2 and the new aircraft stands. All works under BIM.

Key figures

prevision image
Current capacity of T1: 9.5 MPPA
prevision image
Target capacity with addition of T2: 25 MPPA
prevision image
T2 area 175,000 sqm / T1 area 20,000 sqm. 510,000 sqm airside
prevision image
57 aircraft stands 2 runways

Photographic Evidence

Projet arturo benitez
Projet arturo benitez
Travaux Santiago Benitez
Travaux Santiago Benitez
Travaux Santiago Benitez
Travaux Santiago Benitez
Travaux Santiago Benitez
Travaux Santiago Benitez
Ce projet est un succès
Off

Keep in touch

The subscriber's email address.
Join us on linkedin logo