Addis-Ababa Bole International Airport

The mega hub currently built will absorb up to 120M pax per year

Update date:

Added value

ADP Ingénierie (ADPI) brings its expertise in supervising airport construction sites and in reviewing airport terminal design.

Context

The significant growth of the national carrier and overall passenger traffic experienced requires the expansion of the existing domestic and international terminals.
The design and construction was awarded to the construction company China Communication Construction Company.

1) The client wants to ensure that the project is undertaken strictly in accordance with the contract (Lot 1).

2) The client wants to ensure that the design meets the required IATA/ICAO SARPs (Lot 1).

3) The client requested a feasibility study and the master plan for the megahub (120 MPax) (Lot 2).

Our solution

ADP Ingénierie is:

  • deploying a onsite team to supervise and manage the contract;
  • assembling a team to support the design review in Dubai;
  • assembling a team in Paris for Lot 2 (megahub feasibility study).
Work of new passenger terminal of Bole International Airport - Addis-Ababa

“For ADP Ingénierie, this is the first project in Ethiopia. This country has a high potential for airports linked to national projects as Ethiopia is a landlocked country and its national carrier – Ethiopian Airlines – is one of the major African carriers.”
Olivier, Project Manager

key figures

prevision image

International terminal T2 expansion and refurbishment of 120,000sqm 

prevision image

Terminal T1 refurbishment and expansion of 20,000sqm 

Ce projet est un succès
Off

Keep in touch

The subscriber's email address.
Join us on linkedin logo